The piling speed is fast, and the pile can be driven 6 meters deep in an average of 3 minutes, that is, a drill hole can be drilled in 3 minutes.
The fuel consumption is low, which is about half of that of ordinary piling machines. Greatly reduce the cost of construction work.
The drill bit is made of manganese steel, which is suitable for various geological environments after special processing.